Notify construction, significant modification or measures involving a change in the hazard level of installations for handling substances hazardous to water (except heating oil consumer installations and JGS installations)

Source: Zuständigkeitsfinder Schleswig-Holstein (Linie6PLus)

Service Description

If you wish to construct or significantly modify a facility for handling substances hazardous to water or take measures that result in a change in the hazard level, you must notify us.

You must submit your notification of the construction, significant modification or change to the hazard level of an installation subject to mandatory inspection to the competent authority in good time in advance.

The construction of these installations does not have to be notified if

  • a suitability assessment has been applied for in accordance with the Water Resources Act for installations for the storage, filling or handling of substances hazardous to water or
  • installations are the subject of an approval procedure under other legislation, provided that the approval procedure also ensures compliance with the requirements of this Ordinance. In this case, significant changes to the installation that require approval are also not subject to notification.

Process flow

If you want to submit the advertisement online:

  • You submit the notification via the online service.
  • The water authority will check your documents for completeness and request any missing information or documents.
  • The content requirements are also checked, which may also result in additional requirements.
  • The authority can temporarily or permanently prohibit the project or issue a decision with conditions.

If you wish to send the notification by letter or e-mail:

  • You fill out the forms required for the notification and send them to the lower water authority.
  • The further procedural steps correspond to the online procedure.
Competent authority

In Schleswig-Holstein, the lower water authorities of the districts or independent cities are responsible.

Requirements

The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.

Which documents are required?
  • Completed notification form
  • Detailed documents describing the project (site plan, drawings, certificates, descriptions)
  • Expert opinion, if applicable
What are the fees?

Fee: 25,00 - 1000,00 EUR
Payment in advance: No

What deadlines do I have to pay attention to?

Please send your notification to the competent authority at least six weeks in advance.

Processing duration

Processing time: 2 - 4 Weeks

Legal basis
What else should I know?
Author

The text was automatically translated based on the German content.

Technically approved by

Ministry for Energy Transition, Climate Protection, Environment and Nature of the State of Schleswig-Holstein

Professionally released on

05.07.2023

Teaser

If you wish to construct or significantly modify a facility for handling substances hazardous to water or take measures that result in a change in the hazard level, you must notify us.

Process flow

If you want to submit the advertisement online:

  • You submit the notification via the online service.
  • The water authority will check your documents for completeness and request any missing information or documents.
  • The content requirements are also checked, which may also result in additional requirements.
  • The authority can temporarily or permanently prohibit the project or issue a decision with conditions.

If you wish to send the notification by letter or e-mail:

  • You fill out the forms required for the notification and send them to the lower water authority.
  • The further procedural steps correspond to the online procedure.

Competent authority

In Schleswig-Holstein, the lower water authorities of the districts or independent cities are responsible.

Requirements

The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.

Which documents are required?

  • Completed notification form
  • Detailed documents describing the project (site plan, drawings, certificates, descriptions)
  • Expert opinion, if applicable

What are the fees?

Fee: 25,00 - 1000,00 EUR
Payment in advance: No

What deadlines do I have to pay attention to?

Please send your notification to the competent authority at least six weeks in advance.

Processing duration

Processing time: 2 - 4 Weeks

Legal basis

What else should I know?

Author

The text was automatically translated based on the German content.

Technically approved by

Ministry for Energy Transition, Climate Protection, Environment and Nature of the State of Schleswig-Holstein

Professionally released on

05.07.2023