Applying for special use of public space for work and construction sites

Source: Zuständigkeitsfinder Schleswig-Holstein (Linie6Plus)

Service Description

Work sites that affect road traffic (construction sites) must be secured.

Work sites that have an impact on road traffic (e.g. excavations in the road, road construction, work in the side area, erection of scaffolding) must be secured.

Before starting work, the contractor must obtain instructions from the competent authority on how the work site is to be cordoned off and marked and how traffic is to be restricted, regulated and routed.


Process flow
  • The contractor must already check which traffic safety measures are necessary and appropriate during the planning phase of the work site based on the local conditions.
  • Following this, a written application must be submitted to the traffic authority for the traffic safety measures to be ordered.
  • The competent authority examines the application and the documents submitted and consults the authorities to be involved (including the police and road construction authorities).
  • If necessary, a site inspection is carried out with all parties involved in order to coordinate the necessary measures on site. The necessary measures are then ordered to be carried out by the contractor.
Who should I contact?

Road traffic authorities in the

  • districts and independent towns
  • towns and municipalities with more than 20,000 inhabitants
  • independent towns and municipalities with up to 20,000 inhabitants
  • local authorities, if the construction site extends exclusively to their own district

or Schleswig-Holstein State Road Construction and Transport Authority

Requirements

Which traffic measures are required to make the work site safe must always be checked on a case-by-case basis. The contractor and the road traffic authority can refer to the guidelines for traffic safety at road works (RSA).

Which documents are required?
  • Written application,
  • Traffic sign plan (either standard RSA plan or individual),
  • Detour plan, if applicable.

Detailed information can be obtained from the responsible office.

What are the fees?

Fee: 10,20 - 767,00 EUR
Payment in advance: no
More detailed information can be obtained from the responsible office.

What deadlines do I have to pay attention to?

Application deadline: 2 Weeks
The application must be submitted at least two weeks before the start of construction work. Extensive construction work requires a much longer lead time.

Legal basis
Author

The text was automatically translated based on the German content.

Teaser

Work sites that affect road traffic (construction sites) must be secured.

Process flow

  • The contractor must already check which traffic safety measures are necessary and appropriate during the planning phase of the work site based on the local conditions.
  • Following this, a written application must be submitted to the traffic authority for the traffic safety measures to be ordered.
  • The competent authority examines the application and the documents submitted and consults the authorities to be involved (including the police and road construction authorities).
  • If necessary, a site inspection is carried out with all parties involved in order to coordinate the necessary measures on site. The necessary measures are then ordered to be carried out by the contractor.

Who should I contact?

Road traffic authorities in the

  • districts and independent towns
  • towns and municipalities with more than 20,000 inhabitants
  • independent towns and municipalities with up to 20,000 inhabitants
  • local authorities, if the construction site extends exclusively to their own district

or Schleswig-Holstein State Road Construction and Transport Authority

Requirements

Which traffic measures are required to make the work site safe must always be checked on a case-by-case basis. The contractor and the road traffic authority can refer to the guidelines for traffic safety at road works (RSA).

Which documents are required?

  • Written application,
  • Traffic sign plan (either standard RSA plan or individual),
  • Detour plan, if applicable.

Detailed information can be obtained from the responsible office.

What are the fees?

Fee: 10,20 - 767,00 EUR
Payment in advance: no
More detailed information can be obtained from the responsible office.

What deadlines do I have to pay attention to?

Application deadline: 2 Weeks
The application must be submitted at least two weeks before the start of construction work. Extensive construction work requires a much longer lead time.