Display commissioning of a low-frequency system or direct current system

Source: Zuständigkeitsfinder Schleswig-Holstein (Linie6PLus)

Service Description

As the operator of a low-frequency system with a rated voltage of 110 KV or more or a direct current system, you are obliged to notify the competent authority before commissioning or making a significant change.

The competent authority will check the notification and record the installation in its register of installations.


Process flow

The notification must be submitted in writing by post or electronically to the competent authority.

Competent authority

The competent authorities are the immission control authorities of the federal states.

Requirements

The prerequisite is that

  • the installation is located on a property in the area of a development plan or within a built-up district or on a property with residential buildings in an outdoor area or crosses such properties,
  • the installation or its substantial modification does not require a permit, planning approval or other official decision in which the interests of immission control are taken into account.
Which documents are required?
  • Display with the relevant data for the system
  • Site plan
What deadlines do I have to pay attention to?

The notification must be submitted to the competent authority at least two weeks before the system is commissioned or before a significant change is made to the system.

Legal basis
Appeal

This administrative service does not constitute an administrative act. For this reason, there is no legal remedy.

Author

The text was automatically translated based on the German content.

Technically approved by

Ministry for the Environment, Energy, Food and Forestry Rhineland-Palatinate

Professionally released on

07.12.2020

Process flow

The notification must be submitted in writing by post or electronically to the competent authority.

Competent authority

The competent authorities are the immission control authorities of the federal states.

Requirements

The prerequisite is that

  • the installation is located on a property in the area of a development plan or within a built-up district or on a property with residential buildings in an outdoor area or crosses such properties,
  • the installation or its substantial modification does not require a permit, planning approval or other official decision in which the interests of immission control are taken into account.

Which documents are required?

  • Display with the relevant data for the system
  • Site plan

What deadlines do I have to pay attention to?

The notification must be submitted to the competent authority at least two weeks before the system is commissioned or before a significant change is made to the system.

Legal basis

Appeal

This administrative service does not constitute an administrative act. For this reason, there is no legal remedy.

Author

The text was automatically translated based on the German content.