responsibility finder
Schleswig-Holstein

Request temporary no stopping zone

Source: Zuständigkeitsfinder Schleswig-Holstein (Linie6PLus)

Service Description

You can apply for a no-stopping zone. This is limited in time. You can apply for a no-stopping zone for removals or for loading and unloading.


Process flow

You can submit the application in writing by means of an informal application.

  • The application will be reviewed by the competent authority.
  • If the result is positive, you will receive a permit and a road traffic order from the competent authority to erect the required traffic signs.
  • Important for the application are
    • the location
    • the time period
    • the length in meters
    • the length depends on the vehicle used
Requirements

You do not have to fulfill any specific requirements.

What are the fees?

The fee varies depending on the duration and scope of the permit.

What deadlines do I have to pay attention to?

The permit is only valid for the period specified on the order.

Application deadline: 14 Days
The application must be submitted at least 14 days in advance, as the traffic signs for the residents must be set up 3 days in advance.

Processing duration

Processing usually takes place immediately or promptly.

Legal basis
Appeal
  • Appeal
  • Further information on how to lodge an appeal can be found in the notification of your application
  • Appeal to the administrative court
What else should I know?

The required traffic signs must be erected at least three days before the no stopping zone is used. The traffic signs may only be erected after the permit has been received.

Only traffic signs in accordance with the German Road Traffic Regulations (StVO) may be erected.

The signs can also be erected by an installation service.

You must record the installation in an installation log. You should note the time and exact location of the installation.

In the event of damage, the persons submitting the application may be liable.

Third-party vehicles in the established no-parking zone can be removed.

Additional measures must be specified in the application; additional permits may be required for this (e.g. a special use application for containers).

You will need a separate order for the move-in and move-out locations.

It is not advisable to block off a parking space with lines, tapes, cardboard boxes or chairs. Other people looking for a parking space can and may move these obstacles aside and park. The police also intervene when they see such barriers. A warning or fine is then often imposed.

After the move or the delivery and removal, make the signs ineffective. If necessary, return the signs to the borrowed location.

Author

The text was automatically translated based on the German content.

Technically approved by

Authority for Transport and Mobility Turnaround (BVM), Fundamentals of Road Engineering VI 1

Professionally released on

20.06.2022

Process flow

You can submit the application in writing by means of an informal application.

  • The application will be reviewed by the competent authority.
  • If the result is positive, you will receive a permit and a road traffic order from the competent authority to erect the required traffic signs.
  • Important for the application are
    • the location
    • the time period
    • the length in meters
    • the length depends on the vehicle used

Requirements

You do not have to fulfill any specific requirements.

What are the fees?

The fee varies depending on the duration and scope of the permit.

What deadlines do I have to pay attention to?

The permit is only valid for the period specified on the order.

Application deadline: 14 Days
The application must be submitted at least 14 days in advance, as the traffic signs for the residents must be set up 3 days in advance.

Processing duration

Processing usually takes place immediately or promptly.

Legal basis

Appeal

  • Appeal
  • Further information on how to lodge an appeal can be found in the notification of your application
  • Appeal to the administrative court

What else should I know?

The required traffic signs must be erected at least three days before the no stopping zone is used. The traffic signs may only be erected after the permit has been received.

Only traffic signs in accordance with the German Road Traffic Regulations (StVO) may be erected.

The signs can also be erected by an installation service.

You must record the installation in an installation log. You should note the time and exact location of the installation.

In the event of damage, the persons submitting the application may be liable.

Third-party vehicles in the established no-parking zone can be removed.

Additional measures must be specified in the application; additional permits may be required for this (e.g. a special use application for containers).

You will need a separate order for the move-in and move-out locations.

It is not advisable to block off a parking space with lines, tapes, cardboard boxes or chairs. Other people looking for a parking space can and may move these obstacles aside and park. The police also intervene when they see such barriers. A warning or fine is then often imposed.

After the move or the delivery and removal, make the signs ineffective. If necessary, return the signs to the borrowed location.

Author

The text was automatically translated based on the German content.

Technically approved by

Authority for Transport and Mobility Turnaround (BVM), Fundamentals of Road Engineering VI 1

Professionally released on

20.06.2022

Further information and offers