Special use permit on public roads and squares: Underground special use
Source: Zuständigkeitsfinder Schleswig-Holstein (Linie6Plus)
Service Description
Anyone wishing to lay pipes or cables under public roads, for example, requires a permit.
If you have lines, for example factory lines, pipe and cable lines for
- electricity,
- gas,
- district heating,
- water and waste water with house connections,
that serve private purposes under public roads, you need a permit.
Teaser
Anyone wishing to lay pipes or cables under public roads, for example, requires a permit.
Who should I contact?
To the municipal, local or city administration or to the Schleswig-Holstein State Road Construction and Transport Authority (as the responsible road construction authority).
Which documents are required?
A detailed plan with information on the type, scope and duration of the project.
What are the fees?
The usage fees are based on the relevant usage fee regulations. In addition, all costs incurred by the respective road authorities as a result of the special use must be reimbursed at their request. Detailed information on this can be obtained from the responsible authority.
What deadlines do I have to pay attention to?
The special use permit must be applied for before the start of the measure.
Legal basis
Applications / forms
Applications must be submitted informally.
What else should I know?
A contract under private law is concluded for use.
Author
The text was automatically translated based on the German content.